The Optimization Consideration for the Target Network of Chengdu Transmission-line System of Electric Power in 2020

机译:2020年成都输电系统目标网的优化考虑

获取原文
获取原文并翻译 | 示例

摘要

In this article, the target network capacity of Chengdu transmission-line system of electric power in 2020 is determined .According to the prediction, the load of Chengdu electric power network is estimated to reach 11.00 million kW in 2020, which is equivalent to or go beyond the level of the maximum electricity consumption load of the Chinese cities. If the original allocation plan for the target network of Chengdu electric power network in 2020 is still adopted, it can result in excessive construction scale of electric power network. In this way, there is no doubt that the excessive construction will use plenty of land resources as the sites of the stations and occupy large number of line channels. Meanwhile, it brings huge pressure for the self economic operation to the electric power network enterprises. Therefore, in the target network planning of Chengdu electric power network, we discuss and study the optimization consideration on basis of the estimation to the load of Chengdu electric power network in 2020.
机译:本文确定了2020年成都输电系统的目标电网容量,根据预测,到2020年成都电网的负荷估计将达到1100万千瓦,相当于或高于超出了中国城市的最大用电负荷水平。如果仍然采用到2020年成都电网目标网络的原始分配方案,可能会导致电网建设规模过大。这样,毫无疑问,过度建设将占用大量土地资源作为车站所在地,占用大量线路。同时,这给电网企业的自营经营带来了巨大压力。因此,在成都电网目标网络规划中,我们根据对2020年成都电网负荷的估算来讨论和研究优化考虑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号