首页> 外文会议>43rd International Erosion Control Association annual conference 2012. >Managing EPA's Effluent Limitation Guidelines and Numeric Effluent Limit for Turbidity
【24h】

Managing EPA's Effluent Limitation Guidelines and Numeric Effluent Limit for Turbidity

机译:管理EPA的污水限量指南和浑浊度的数值污水限量

获取原文
获取原文并翻译 | 示例

摘要

This workshop includes in depth information on EPA's new effluent limitation guidelines (ELGs) for the construction and development industry. The workshop is designed to demystify the ELGs, described the non-numeric BMP requirements, discuss the numeric effluent limitation (NEL), discuss a variety of passive treatment systems (PTS), discuss a variety of active treatment systems (ATS) and provide design principles for achieving compliance with the ELGs and the NEL. The goal of the workshop is to provide attendees with the knowledge and tools necessary to evaluate individual construction sites and determine how to design, plan and implement BMPs, PTS and/or ATS to achieve compliance with the ELGs. Section one of the workshop discusses the development of EPAs ELGs and how they impact the construction industry, municipalities and contractors. The section includes the ELG details and a state by state implementation schedule. Section 2 of the workshop covers the NEL and the impact on larger sites and the eventual impact on smaller projects. This section describes how the NEL was established and the compliance monitoring that will be required for projects that fall within the NEL. Sections 3 of the workshop, includes a variety of PTS along with specific case studies to demonstrate applicability of each approach. This section also includes a hands on activity to demonstrate jar testing with a variety of water treatment chemicals utilized in PTS. Section 4 of the workshop covers the types of ATS currently being implemented on construction sites and will include a hands on demonstration to determine the applicability and effectiveness of ATS to project specific conditions. The final section of the workshop focuses on utilizing the information from the previous sections to develop a cost effective approach to managing stormwater runoff and achieving compliance with ELGs and the NEL. This section demonstrates how to include the use of PTS or ATS into the project SWPPP and how to manage and minimize the costs associated with implementing, maintaining and operations PTS or ATS. Attendees can utilize these strategies for complying with non-numeric BMP requirements, reduce exposure to the NEL and achieve compliance with the NEL on larger construction sites.
机译:该讲习班包括有关EPA针对建筑和开发行业的新的排放限值指南(ELG)的深入信息。该研讨会旨在消除ELG的神秘色彩,描述非数字BMP要求,讨论污水排放限值(NEL),讨论各种被动处理系统(PTS),讨论各种主动处理系统(ATS)并提供设计遵守ELG和NEL的原则。研讨会的目的是为与会人员提供必要的知识和工具,以评估各个施工现场并确定如何设计,规划和实施BMP,PTS和/或ATS,以实现与ELG的合规性。研讨会的第一部分讨论了EPAs ELG的发展以及它们如何影响建筑业,市政当局和承包商。本节包括ELG详细信息和状态逐个实施时间表。研讨会的第2节介绍了NEL,对较大站点的影响以及对较小项目的最终影响。本节介绍了如何建立NEL,以及属于NEL内的项目所需的合规性监视。研讨会的第3节包括各种PTS以及特定案例研究,以证明每种方法的适用性。本节还包括一个动手练习,演示使用PTS中使用的各种水处理化学品进行广口瓶测试。讲习班的第4节介绍了目前在建筑工地上实施的ATS的类型,并将包括演示以确定ATS在项目特定条件下的适用性和有效性。研讨会的最后一部分着重于利用先前各部分中的信息来开发一种经济有效的方法来管理雨水径流并实现对ELG和NEL的遵守。本节演示如何将PTS或ATS的使用包括在项目SWPPP中,以及如何管理和最小化与PTS或ATS的实施,维护和运营相关的成本。与会者可以利用这些策略来满足非数字BMP要求,减少对NEL的暴露,并在较大的建筑工地上达到NEL的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号