首页> 外文会议>The 3rd International Conference on The Concrete Future(第三届混凝土未来国际会议) >LIFE PREDICTION OF CONCRETE STRUCTURES AFTER ELECTROCHEMICAL CHLORIDE EXTRACTION
【24h】

LIFE PREDICTION OF CONCRETE STRUCTURES AFTER ELECTROCHEMICAL CHLORIDE EXTRACTION

机译:电化学氯化物萃取后混凝土结构的寿命预测

获取原文
获取原文并翻译 | 示例

摘要

Electrochemical chloride extraction (ECE) test of cylinder RC specimens have been made with different extraction duration, 4 weeks, 6 weeks and 8 weeks respectively. After ECE treatment, the ions profile in concrete has been studied. Study has shown that ECE can remarkably reduce the chloride concentration in concrete and change the profile of the chloride ions, but also increase the OH" concentration nearby the steel bars. Hence the improvement of the ECE method to concrete durability depends on both chloride extraction and OH- concentration. Nevertheless the ECE can change the chloride diffusion coefficient. Tests have shown that after ECE, the chloride diffusion coefficient of concrete is lesser than that of the original one. In order to made the life prediction of concrete structures treated by ECE, the chloride and OH- profile, the chloride diffusion coefficient after ECE must be take into consideration. In this paper, the life prediction of concrete structures treated by ECE has been made.
机译:圆柱RC样品的电化学氯化物提取(ECE)测试分别以不同的提取时间进行,分别为4周,6周和8周。经过ECE处理后,已经研究了混凝土中的离子分布。研究表明,ECE可以显着降低混凝土中的氯离子浓度并改变氯离子的分布,但也可以增加钢筋附近的OH“浓度。因此,ECE方法对混凝土耐久性的改进取决于氯离子的提取和OH-浓度,尽管如此,ECE仍会改变氯离子的扩散系数;试验表明,ECE处理后,混凝土的氯离子扩散系数要小于原来的氯离子扩散系数。考虑到氯离子和OH-型,必须考虑ECE后氯离子的扩散系数,对ECE处理混凝土结构的寿命进行了预测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号