首页> 外文会议>36th Forum on the Geology of Industrial Minerals and 11th Extractive Industry Geology Conference, May 7-12, 2000, Bath, England >The hydrogeological effect of quarrying karstified limestone: operational requirements for monitoring and mitigation
【24h】

The hydrogeological effect of quarrying karstified limestone: operational requirements for monitoring and mitigation

机译:喀斯特石灰岩采石场的水文地质效应:监测和缓解的操作要求

获取原文
获取原文并翻译 | 示例

摘要

Limestone extraction can impact upon both the saturated and unsaturated zones, depending upon the nature and extent of the quarry and the limestone's hydrological parameters. However, this impact can be mitigated if a programme of monitoring is instigated to determine when an impact occurs, and if viable cost effective options for mitigation have been considered in advance of dewatering. Two such monitoring and mitigation schemes are reviewed in this paper. The first, a scheme associated with a new quarry for Castle Cement at Ribblesdale, includes substantial monitoring with proposals for mitigation should an impact be identified. The second scheme relates to Torr Quarry in the Mendip Hills, which has been operating sub-water table since 1986. Extensive monitoring has been undertaken since this time with augmentation of three streams around the quarry. The system of augmentation is currently being modified as part of quarry deepening.
机译:石灰石的提取会影响饱和区和非饱和区,具体取决于采石场的性质和范围以及石灰石的水文参数。但是,如果通过制定监控程序来确定何时发生影响,以及在脱水之前是否已经考虑了可行的成本有效的缓解措施,则可以减轻这种影响。本文回顾了两种这样的监测和缓解方案。第一个方案与Ribblesdale的Castle Cement的新采石场有关,包括对实质性的监测,并在发现影响后提出缓解建议。第二种方案与Mendip Hills的Torr Quarry有关,该方案自1986年以来一直在地下水位运行。自那时以来,已经进行了广泛的监测,并增加了采石场周围的三股水流。作为采石场加深的一部分,目前正在对增强系统进行修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号