首页> 外文会议>28th pump users symposium >IF YOU INSTALL A PUMP SUBSEA, LEAVE NOTHING TO CHANCE
【24h】

IF YOU INSTALL A PUMP SUBSEA, LEAVE NOTHING TO CHANCE

机译:如果您安装泵吸盘,别无所求

获取原文
获取原文并翻译 | 示例

摘要

In 2011, for the first time Hybrid Multiphase Pumpsrnhave been deployed on the seafloor. This was OffshorernAngola, at 800m Water Depth, to ensure the full fieldrndevelopment of Pazflor Deep Sea Project by pumping thernviscous oils of the Miocene fields. Through the example ofrnthese Pazflor subsea pumps, this paper invites the reader torndiscover, step by step, the thorough acceptance testsrnprogram that was put in place to mitigate as much asrnpossible the risks before installation. This paper relatesrnhow, after 15 months of Acceptance tests, the eight HybridrnPumps were declared Ready for Deployment.
机译:2011年,混合多相泵首次在海底部署。这是离岸安哥拉,水深为800m,通过泵送中新世油田的粘稠油来确保Pazflor深海项目的完整开发。通过这些Pazflor海底泵的示例,本文邀请读者逐步发现为降低在安装前可能发生的风险而制定的全面验收测试程序。本文讨论了如何在经过15个月的验收测试后宣布八个HybridPumps准备部署。

著录项

  • 来源
    《28th pump users symposium》|2012年|1-7|共7页
  • 会议地点 Houston TX(US)
  • 作者单位

    MPP SpecialistTotalParis la Defense, France;

    Head of Rotating Machinery DepartmentTotalPau, France;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-26 14:15:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号