首页> 外文会议>21st International congress on irrigation and drainage : Water productivity towards food security. >IMPROVEMENT OF IRRIGATION AND DRAINAGE MANAGEMENT THROUGH PARTICIPATORY IRRIGATION MANAGEMENT AT ALL STAGES IN BAND-AMIR AREA IN FARS PROVINCE
【24h】

IMPROVEMENT OF IRRIGATION AND DRAINAGE MANAGEMENT THROUGH PARTICIPATORY IRRIGATION MANAGEMENT AT ALL STAGES IN BAND-AMIR AREA IN FARS PROVINCE

机译:费边带状地区各阶段通过参与式灌溉管理改善灌溉与排水管理

获取原文
获取原文并翻译 | 示例

摘要

Optimizing irrigation and drainage networks management is possible when there is a fullrncooperation among all the stake holders. Governmental involvement in deciding key issuesrnwithout considering the local communities’ viewpoints often results in the latter’s alienationrnin matters of water management. In order to decrease social problems and challenges inrnexecuting and operating irrigation and drainage networks and improving their performance,rnit is necessary for all principal agents to take into account the opinions of water users andrnensure their participation in design, execution, operation and maintenance of networks.rnSecond phase studies of irrigation and drainage networks of Band-Amir in Fars province, wasrnaccomplished by Mahab Ghodss Consulting Engineering Company in 1384, and in order tornfacilitate execution of the contract, documents and construction drawings were prepared inrnfour different developmental zones. These were put out to tenders by Fars Regional WaterrnBoard Shareholders Company. After selecting the relevant contractor, construction processrnbegan in 1382.rnAlong with the project construction development, there gradually emerged some socialrnproblems which were due to differing viewpoints of network water users with the projectrndesign. It was decided that the consultant undertake social studies, ensure people’s.
机译:当所有利益相关者之间全面合作时,优化灌溉和排水网络管理是可能的。政府参与决定关键问题而没有考虑当地社区的观点,通常会导致后者在水管理事务上的疏远。为了减少在执行和运行灌溉和排水管网方面的社会问题和挑战并提高其性能,所有主要代理人都必须考虑到用水者的意见,并确保他们参与管网的设计,执行,运行和维护,以免陷入困境。 1384年,Mahab Ghodss咨询工程公司完成了Fars省Band-Amir灌溉和排水网络的第二阶段研究,并且为了促进合同的执行,在四个不同的开发区中准备了文件和施工图。这些由Fars地区WaterrnBoard股东公司招标。在选择了相关承包商之后,建设过程始于1382年。随着项目建设的发展,由于网络用水用户对项目设计的不同看法,逐渐出现了一些社会问题。决定由顾问进行社会研究,确保人民的安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号