首页> 外文会议>20th world gas conference >HO-02: PEAK SHAVING PLANT AT GRAL. RODRIGUEZ (BUENOS AIRES, ARGENTINA) AND ITS ROLE TO FULFILL NATURAL GAS DEMAND
【24h】

HO-02: PEAK SHAVING PLANT AT GRAL. RODRIGUEZ (BUENOS AIRES, ARGENTINA) AND ITS ROLE TO FULFILL NATURAL GAS DEMAND

机译:HO-02:GRAL的削峰植物。罗德里格斯(阿根廷布宜诺斯艾利斯)及其对满足天然气需求的作用

获取原文
获取原文并翻译 | 示例

摘要

This paper addresses the problems and management tools of the distribution system operated by Gas NaturalrnBAN within the global argentinean gas structure, and justify the convenience of having a Liquefied NaturalrnGas Storage Plant, i.e. Peak Shaving Plant in the surroundings of Buenos Aires where happens to be the largestrnconcentration of natural gas consumers in the country. This Plant is a technical alternative to fulfill uncoveredrndemand during winter and besides results to be efficient and competitive when compared with the option ofrnincrementing the transportation capacity of the main pipelines.rnThe paper details the process followed when designing and building the Peak Shaving Plant, the design basisrnand philosophy, its main features and also the main characteristics of the commissioning and operation.
机译:本文探讨了由Gas NaturalrnBAN在全球阿根廷天然气结构中运营的分配系统存在的问题和管理工具,并证明了在布宜诺斯艾利斯附近设有液化天然气储藏厂(即削峰工厂)的便利性是合理的该国最大的天然气消费者集中度。该工厂是在冬季满足未公开需求的技术选择,此外,与增加主管道的运输能力的选择相比,结果是高效和有竞争力的。本文详细介绍了设计和建造削峰工厂时所遵循的过程,基础理念,其主要特征以及调试和操作的主要特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号