1. Provenrn1.1 In continuous operation since 12/2009rn1.2 Dried & refined more than 50 million tons of lignitern2. Reliablern2.1 95+% availability, no major outages or incidentsrn2.2 Improved plant availabilityrn3. Cost Effectivern3.1 Capital cost DryFining estimated at $150/kW installed*rn3.2 Operating cost estimated at $0.40/tonne more than offset byrnefficiency savings of $2.68/tonne.