The process of liberalization of power markets has led to a paradigm shift in the joint expansion planning of the generation and transmission segments. The assessment of this problem is even more complex when considering the uncertainties that usually determine the long-term evolution of the system. Moreover, and from the point of view of regulators and policy makers, an optimal assessment is of great interest because the lack of coordination between the two types of investment can jeopardize competition and efficiency in the whole electricity sector. In this regard, the literature suggests the use of holistic approaches, which necessarily evaluate the risks associated with the coordination of investments in the power system, in order to allow regulators to identify an efficient investment alternative, considering scenarios in which the uncertain variables evolve unfavorably. In this context, this paper test a method to assess the joint expansion planning of the generation and transmission segments, considering the inherent flexibility of generation investments, using the Real Options Valuation approach, calculated with the Least Squares Monte Carlo. In order to validate this method, a case study has been simulated. It is shown that the consideration of investments' flexibility allows increasing the system-wide social benefit through the coordinated p.lanning of the generation and transmission segments.
机译:电力市场的自由化进程导致了发电和输电部门联合扩张计划的模式转变。当考虑通常确定系统长期演进的不确定性时,对该问题的评估甚至更加复杂。此外,从监管机构和政策制定者的角度出发,进行最佳评估非常重要,因为两种投资类型之间缺乏协调会损害整个电力行业的竞争和效率。在这方面,文献建议使用整体方法,该方法必须评估与电力系统投资协调相关的风险,以便允许监管机构在考虑不确定变量不利发展的情况下,确定有效的投资选择。 。在这种情况下,本文使用最小二乘蒙特卡洛方法,采用实物期权评估方法,考虑了发电投资固有的灵活性,测试了一种评估发电和输电线路联合扩展计划的方法。为了验证此方法,已对案例研究进行了仿真。结果表明,考虑投资灵活性可以通过协调发电和输电部门的规划来增加全系统的社会效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号