Diagnosis of withstand test power transformer based on through fault current disturbance

机译:基于直通故障电流干扰的耐压试验变压器诊断

获取原文
获取原文并翻译 | 示例

摘要

Transformers damage happened in Transmisi Jawa Bagian Tengah from 2008 until 2015 as much as 54 times. Active part damage, especially in winding, are the most major cases happened as much as 34 from 54 damage (63%), it was almost caused by Through Fault Current in seconday side of transformer (feeder). Diagnosis concept applied in PLN Transmisi Jawa Bagian Tengah considered into three (3) level assessment, there are health assessment, risk assesment (component level) and risk assessment (corporate level). The scope of this paper only discuss health assessment with condition index in each measurement for 21 unit step down power transformers which have been passed over withstand capability calculation. Measurement result grouped into condition index to see what is the dominant effect from through fault current and to correlate the relationship between one measurement with anothers. In conclusion, from all of type measurement were done, the worst effected by through fault current which produces high current in
机译:从2008年到2015年,变形金刚(Transmisi Jawa Bagian Tengah)发生的变压器损坏多达54次。有源部件的损坏,特别是在绕组中,是最主要的情况,发生于54处,其中有34处(63%),这几乎是由变压器(馈线)第二侧的贯通故障电流引起的。 PLN Transmisi Jawa Bagian Tengah中应用的诊断概念分为三(3)级评估,包括健康评估,风险评估(组件级)和风险评估(企业级)。本文的范围仅讨论已通过耐压计算的21台降压型电力变压器每次测量中带有状态指标的健康评估。将测量结果分组为条件索引,以查看通过故障电流产生的主要影响,并使一种测量与另一种测量之间的关系相关联。总之,从所有类型的测量中得出,最严重的影响是通过故障电流,该故障电流会在

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号