Feasibility analysis with capital budgeting backbone network fiber optic cable west palapa ring

机译:用资本预算骨干网西帕拉帕环网进行可行性分析

获取原文
获取原文并翻译 | 示例

摘要

Fiber optic backbone network becomes an important factor in broadband infrastructure, where palapa ring is a telecommunication infrastructure network mega project of high speed fiber optic backbone network with assumption an investment value of 1 Trillion IDR. Therefore, in the investment planning of the construction of the palapa ring project, feasibility analysis is needed to optimize the implementation. In this research, feasibility is analyzed based on capital budgeting on Payback Period, NPV, and IRR. Capital Budgeting simulation results show that it takes 3 years 1 month for payback, NPV> 0, IRR of 35%.
机译:光纤骨干网已成为宽带基础设施的重要因素,其中palapa ring是电信光纤基础设施网络的大型项目,假定高速光纤骨干网的投资价值为1万亿印尼盾。因此,在帕拉帕环项目的建设投资计划中,需要进行可行性分析以优化实施。在这项研究中,基于投资回收期,NPV和IRR的资本预算分析了可行性。资本预算模拟结果表明,投资回收期为3年1个月,NPV> 0,IRR为35%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号