首页> 外文会议>2017 9th IEEE-GCC Conference and Exhibition >Reducing Transformer Oil Leakages in Projects
【24h】

Reducing Transformer Oil Leakages in Projects

机译:减少项目中的变压器漏油

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This paper discusses a study conducted on historical transformer oil leakages reported during projects at a major Oil Company. The objective was to identify means of reducing oil leak incidents and thereby reducing its impact to company projects and operations. The study involved review of all data reported over a 10-year period relating to transformer deficiencies during the electrical equipment manufacturing phase of many projects. All contributing factors to this problem were investigated and analyzed including the effectiveness of Source Inspection and testing requirements during the Manufacturing Stage of the transformers. The study revealed some identified risk inspection areas that need more attention during the manufacturing of transformers which may lead to oil leakages if not properly verified and successfully inspected. Examples of risk areas include the visual inspection of welds, and liquid penetrant testing prior to leak test.
机译:本文讨论了对一家大型石油公司在项目期间报告的历史变压器油泄漏进行的研究。目的是确定减少漏油事件的方法,从而减少其对公司项目和运营的影响。该研究涉及对许多项目在电气设备制造阶段的变压器缺陷相关的十年来报告的所有数据的审查。对该问题的所有促成因素进行了调查和分析,包括在变压器制造阶段进行源检验和测试要求的有效性。这项研究发现了一些已确定的风险检查领域,在变压器制造过程中需要更多注意,如果未正确验证和成功检查,可能会导致漏油。风险区域的示例包括焊缝的外观检查以及泄漏测试之前的液体渗透剂测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号