首页> 外文会议>2016 Prognostics and System Health Management Conference >A new model of preventive maintenance scheduling for parallel production line
【24h】

A new model of preventive maintenance scheduling for parallel production line

机译:并行生产线预防性维修计划的新模型

获取原文
获取原文并翻译 | 示例

摘要

Based on the analysis of the difficulty of preventative maintenance scheduling for Multi-product Parallel Production Line in equipment manufacturing industry, this paper establishes the preventive maintenance scheduling model which chooses the maximal of urgent task production as the objective function and multi-product production, preventive maintenance time windows, maintenance groups as the constraints. The successful solution of preventive maintenance scheduling example in an equipment manufacturing factory is the proof of the accuracy and usefulness of the model.
机译:在分析装备制造业多产品并行生产线预防性维修调度的难点的基础上,建立了以最大紧急生产任务为目标函数,多任务生产,预防性的预防性维修调度模型。维护时间窗口,维护组为约束。设备制造厂预防性维修计划示例的成功解决方案是该模型准确性和实用性的证明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号