Black start experiences for 400 kV hydro power plant in western regional grid of India

机译:印度西部区域电网400 kV水电站的黑启动经验

获取原文
获取原文并翻译 | 示例

摘要

Black start exercises are planned exercises carried out with the black start capable generating stations to test their readiness for the unforeseen emergency situation. The Western Regional grid in India is having a number of such units, which are either hydro or gas based power stations. Since 2011, various such exercises are being carried out on a regular basis in Western Regional Grid of India to bring out the challenges associated with grid restoration with black start of hydro & gas generators. This has helped the system operators in the upgrading the methodology of restoration and identifying other corrective actions for improving upon the existing practices for a successful black start. This paper is an attempt at sharing the experiences gained during various black start mock drills conducted in western region on a hydropower plant connected at 400 kV EHV grid and bring forth the challenges faced during this controlled black start activity followed by remedial actions. These exercises have helped in boosting the confidence of system operators to deal with real blackout scenarios while improving the performance of the black start capable generators over the years.
机译:黑启动演习是计划的具有黑启动能力的发电站进行的演习,以测试其在未预见的紧急情况下的准备情况。印度的西部地区电网中有许多这样的机组,它们都是水力或天然气发电厂。自2011年以来,印度西部区域电网定期进行各种此类演习,以提出与水力发电和天然气发电机黑启动相关的电网恢复带来的挑战。这帮助系统操作员升级了恢复方法,并确定了其他纠正措施,以改进现有做法,从而成功地实现了黑启动。本文旨在分享在西部地区在连接到400 kV超高压电网的水电厂进行的各种黑启动模拟演习中获得的经验,并提出在受控的黑启动活动以及随后的补救措施中所面临的挑战。多年来,这些练习帮助提高了系统操作员应对实际停电情况的信心,同时提高了具有黑启动能力的发电机的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号