首页> 外文会议>2016 IEEE PES Transmission amp; Distribution Conference and Exposition -Latin America >Long term transmission expansion planning considering generation-demand scenarios and HVDC lines
【24h】

Long term transmission expansion planning considering generation-demand scenarios and HVDC lines

机译:考虑发电需求和HVDC线路的长期输电扩展计划

获取原文
获取原文并翻译 | 示例

摘要

This paper presents a mathematical model and a methodology to solve the transmission expansion planning problem considering generation-demand scenarios and alternative investments using High Voltage Direct Current (HVDC) links. The methodology determines the optimal expansion plan that allows the power system to operate properly in an environment with extreme generation scenarios and multiple demand scenarios obtained for the pessimistic and optimistic scenarios projected. The multiple generation-demand scenarios produced high investment cost for the future network but this cost can be reduced including HVDC links in the expansion alternatives. The planning problem is solved using C++ and CPLEX. The methodology is tested on the modified Garver system with good results.
机译:本文提出了一种数学模型和一种方法,以解决考虑发电需求和使用高压直流(HVDC)链路的替代投资的输电扩展规划问题。该方法确定了最佳的扩展计划,该计划可使电源系统在极端发电情景和针对预测的悲观和乐观情景而获得的多个需求情景的环境中正常运行。多种发电需求方案为未来的网络带来了高昂的投资成本,但可以降低这一成本,包括在扩展方案中使用HVDC链路。使用C ++和CPLEX解决了规划问题。在改进的Garver系统上对该方法进行了测试,结果良好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号