HV substation fault and its impacts on HV cable: Safety procedures

机译:高压变电站故障及其对高压电缆的影响:安全规程

获取原文
获取原文并翻译 | 示例

摘要

The demand on High voltage (HV) infrastructures is growing due to the corresponding growth in industries and population. To meet the increasing electrical demand, existing substations are being upgraded to accommodate the additional load requirements. Substation upgrade involves up-rating the existing transmission lines or the installation of new lines. Transmission mains consist of underground (UG) or overhead (OH) sections. In many cases, to save on easement cost and reduce the environmental impacts, the upgrade of an existing substation involves the installation of new UG feeder that runs using the same easement as the existing OH lines. This paper discusses the safety implications of the cable installation under substation fault for both conditions, new UG line using existing and new easement. Furthermore, the paper outlines safety procedures to ensure human safety compliance during the cable installation, jointing and terminations. A case study is included.
机译:由于行业和人口的相应增长,对高压(HV)基础设施的需求也在增长。为了满足不断增长的电力需求,现有的变电站正在升级以适应额外的负载要求。变电站的升级涉及升级现有的输电线路或安装新的线路。输电干线由地下(UG)或高架(OH)部分组成。在许多情况下,为了节省地役成本并减少对环境的影响,对现有变电站的升级需要安装新的UG馈线,该馈线的运行方式与现有OH线路相同。本文讨论了变电站故障下电缆安装对两种情况的安全影响,这两种情况都使用新的UG线路和现有的地役权。此外,本文还概述了安全程序,以确保电缆安装,连接和端接期间的人身安全。包括一个案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号