Techno-economic feasibility of using 400 kV for the 2032 transmission system of Sri Lanka

机译:在斯里兰卡2032年输电系统中使用400 kV的技术经济可行性

获取原文
获取原文并翻译 | 示例

摘要

Congestion occurs on the nation's electric transmission grids with the addition of new generation to meet the increasing electricity demand. Therefore, reliable, efficient and better quality of supply urge introduction of new higher voltage levels for power transmission. However, it has to be technically feasible and economically justifiable for the country. Technical feasibility and economic justification of introducing a higher voltage than that of existing voltage to transmit bulk power to load centers from bulk power generating stations in Sri Lanka is discussed in detail in this research.
机译:为了满足不断增长的电力需求,随着新一代电网的出现,该国的输电网络出现了拥堵。因此,可靠,高效和更好的电源质量促使人们引入新的更高电压电平进行电力传输。但是,对于该国来说,它必须在技术上可行并且在经济上合理。这项研究详细讨论了引入比现有电压更高的电压以将大功率从大功率发电站传输到负荷中心的技术可行性和经济合理性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号