首页> 外文会议>2015 XXV International Conference on Information, Communication and Automation Technologies >Partial discharges measurements as an on-site diagnostic tool during after-laying tests of high voltage extruded cable systems
【24h】

Partial discharges measurements as an on-site diagnostic tool during after-laying tests of high voltage extruded cable systems

机译:在高压挤压电缆系统的敷设测试期间,局部放电测量作为现场诊断工具

获取原文
获取原文并翻译 | 示例

摘要

In order to determine actual condition of the cable systems and to determine their future performances, it is necessary to include the procedures for partial discharges (PD) measurements in addition to after-laying testing of new-installed high voltage (HV) power extruded cables. In this work primarily the need to test HV extruded cable systems on PD during after-laying test is considered. By simulation of two types of defects with contemporary software support COMSOL Mph inside the cable accessories, resulting as bad workmanship during installation and/or transport and storage, attempt is to justify the needs for PD measurements inclusion in actual standards concerning analyses of extruded cable systems (IEC 60840 and 62067).
机译:为了确定电缆系统的实际状况并确定其未来性能,除了对新安装的高压(HV)功率挤压电缆进行铺设后测试外,还必须包括局部放电(PD)测量程序。在这项工作中,主要考虑了在敷设测试期间需要在PD上测试高压挤压电缆系统的需求。通过使用电缆附件内部的现代软件支持COMSOL Mph对两种类型的缺陷进行仿真,从而导致安装和/或运输和存储过程中的工艺不良,试图证明对PD测量的需求是合理的,该需求包括在有关挤压电缆系统分析的实际标准中(IEC 60840和62067)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号