首页> 外文会议>2015 IEEE Eindhoven PowerTech >Investigation of suitability of cascading outage assessment methods for real-time assessment
【24h】

Investigation of suitability of cascading outage assessment methods for real-time assessment

机译:级联中断评估方法对实时评估的适用性调查

获取原文
获取原文并翻译 | 示例

摘要

This paper investigates the suitability of assessment methods for cascading outages for real-time assessment. A total of ten assessment methods for cascading outages are investigated, and for all of the investigated methods a complexity assessment is performed to assess the suitability of the method to real-time assessment. The investigation revealed that two of the methods are of special interest for further study on real-time assessment of cascading outages. These are the betweenness centrality model, based on network topology, and the manchester model, based on AC power flow.
机译:本文研究了评估方法对级联中断进行实时评估的适用性。总共调查了十种连锁故障的评估方法,并对所有调查的方法进行了复杂度评估,以评估该方法对实时评估的适用性。调查显示,这两种方法对于进一步研究级联故障的实时评估特别有意义。它们是基于网络拓扑的中介中心模型和基于交流潮流的曼彻斯特模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号