首页> 外文会议>2014 IEEE International Conference on System Science ang Engineering >Capacity assignment of the production lines with consideration of equilibrium requirement in iron steel complex
【24h】

Capacity assignment of the production lines with consideration of equilibrium requirement in iron steel complex

机译:考虑平衡需求的钢铁联合企业生产线产能分配

获取原文
获取原文并翻译 | 示例

摘要

This paper concerns the production line capacity assignment problem with consideration of equilibrium requirement, which sources from the practical production management. The problem is to determine the utilized capacity of each production line in the iron & steel complex in order to make the load of each production line equilibrated and keep the logistics between production lines straightway. To tackle this problem, a mathematical programming model is formulated. Then the quadratic objective function is linearized to obtain a linear programming model which can be optimally solved by CPLEX. Finally, the experiment results based on real operational data have been done to illustrate the efficiency of the algorithm.
机译:本文涉及考虑平衡需求的生产线产能分配问题,该问题源于实际生产管理。问题是确定钢铁联合企业中每个生产线的利用能力,以使每个生产线的负荷达到平衡,并保持生产线之间的物流畅通无阻。为了解决这个问题,建立了数学编程模型。然后对二次目标函数进行线性化处理,以得到可通过CPLEX最佳求解的线性规划模型。最后,基于实际操作数据的实验结果已经证明了该算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号