首页> 外文会议>CIRED 2012;Workshop on Integration of Renewables into the Distribution Grid >Evaluation of PV curtailment option to optimize PV integration in distribution network
【24h】

Evaluation of PV curtailment option to optimize PV integration in distribution network

机译:评估光伏削减方案以优化配电网中的光伏集成

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Due to present regulatory framework, connection studies and scheme for generators (PV, Wind…) are designed to guaranty that all capacity can be injected in the feeder any time of the year in normal operation. Any injection above the connection capacity of the contract is forbidden. This can result in grid adaptations (reinforcements or heavier structural modifications) triggered by short duration constraints. It is thus rational to look for alternative solutions with better costs. Among those active curtailments (reduction of active power injection during short periods) appears to have interesting features and possible drawbacks: we develop this idea further in this paper for MV PV generation.
机译:根据当前的法规框架,发电机的连接研究和方案(光伏,风能...)旨在确保正常运行时,每年任何时候都可以将所有容量注入馈线。禁止在合同的连接容量以上进行任何注入。这可能会导致持续时间短的约束触发网格调整(加固或较重的结构修改)。因此,寻找成本更高的替代解决方案是合理的。在这些主动削减措施中(减少短期内的有功功率注入)似乎具有有趣的特征和可能的弊端:我们在本文中进一步发展了这一想法,用于中压光伏发电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号