According to observation and statistics of traffic constructions of Zhaojiabang road station on the rail transit line 9 in the rush hours, this paper studies the change of passenger flow through analyzing the data recorded every 15 minutes. Moreover, it is expected that solutions on the rail transit and the overall situation of traffic congestion can be proposed by forecasting the development trend of passenger flow and analyzing the characteristics of passenger flow site.
展开▼