Multi-criteria selection for TNB transmission line route using AHP and GIS

机译:基于AHP和GIS的TNB传输线路由多准则选择

获取原文
获取原文并翻译 | 示例

摘要

Tenaga Nasional Berhad (TNB) to provide electricity supply in Peninsular Malaysia and was established in 1990. It involved in the generation, transmission, distribution and electricity in Peninsular Malaysia. This study is aimed at studying and determining the optimum route of transmission line using AHP and GIS. Kajang District in Selangor was selected as a study site. Transmission line routing involves a variety of criteria for determine of the suitable route. Alternative routes that balance community input with the most convincing environmental impact, build ability, the use of current and future land, project costs and the needs of a particular electrical system. Four phases of route selection for a transmission line such as Macro Corridor study area, Alternative corridors, Alternative Route, and Preferred Route.
机译:Tenaga Nasional Berhad(TNB)成立于1990年,致力于为马来西亚半岛提供电力。它参与了马来西亚半岛的发电,输电,配电和电力业务。这项研究旨在研究和确定使用AHP和GIS的输电线路的最佳路线。雪兰莪的加影区被选为学习地点。传输线路由涉及确定合适路由的各种标准。在社区投入与最令人信服的环境影响,建筑能力,当前和未来土地的使用,项目成本以及特定电气系统的需求之间取得平衡的替代路线。传输线的四个阶段的路线选择,例如宏走廊研究区域,替代走廊,替代路线和首选路线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号