首页> 外文会议>2012 IEEE Colloquium on Humanities, Science and Engineering Research >Technical competency of client project manager in managing public projects in Malaysia
【24h】

Technical competency of client project manager in managing public projects in Malaysia

机译:客户项目经理在马来西亚管理公共项目的技术能力

获取原文
获取原文并翻译 | 示例

摘要

How well the stakeholders play their part in the project management relatively contributes to the success of construction projects. One of the critical stakeholders is the Client Project Manager (CPM) whom is responsible for ensuring the client interests are well preserve. CPM needs to have knowledge on project management and all the technical skills required to manage the project. Although, they do not perform the actual work of the project, yet CPM needs the same technical skill level as the people doing the work. This paper reports the first stage of the study which is to identify the problem in relation to the CPM technical competency in managing Malaysian public projects. Literature analysis and interviews have been done with several policy makers and experience professionals who have been involved in public projects for more than ten years. The evidence did indicate the CPM is not competent in managing public projects. CPM that are being appointed come from various education backgrounds and CPM has different knowledge and understanding regarding on how to manage projects. Furthermore, there is no standard technical competency model establish for the CPM especially for the use of public CPM. To add to the matter, the quality and standard of the training provided by the responsible ministry are still not up to the industry needs. This work aims to develop the technical competency model for the usage of the public CPM in managing projects. Recognition of these problems will be the basis to build up the professionalism of the public CPM in managing public projects in Malaysia.
机译:利益相关者在项目管理中发挥的作用相对有助于建设项目的成功。客户项目经理(CPM)是关键的利益相关者之一,他负责确保妥善维护客户利益。 CPM需要具有项目管理知识和管理项目所需的所有技术技能。尽管他们没有执行项目的实际工作,但是CPM需要与从事工作的人员相同的技术技能水平。本文报告了研究的第一阶段,即确定与CPM管理马来西亚公共项目的技术能力有关的问题。与参与公共项目十多年的几位决策者和经验丰富的专业人员进行了文献分析和访谈。证据确实表明,植检委没有能力管理公共项目。任命的CPM来自不同的教育背景,并且CPM对如何管理项目有不同的知识和了解。此外,没有为CPM建立标准的技术能力模型,尤其是对于公共CPM的使用。此外,主管部门提供的培训质量和标准仍不符合行业需求。这项工作旨在为在项目管理中使用公共CPM开发技术能力模型。认识到这些问题将成为在马来西亚管理公共项目中建立公共CPM专业化的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号