首页> 外文会议>2012 Conference on Power amp; Energy >Transmission lines operating reliability evaluation based on real-time power flow
【24h】

Transmission lines operating reliability evaluation based on real-time power flow

机译:基于实时潮流的输电线路运行可靠性评估

获取原文
获取原文并翻译 | 示例

摘要

In power system, when a transmission line need to be tripped from the network for some reasons, it maybe lead to some other transmission lines being overload, especially for its associated lines. Overload of transmission lines are considered as one of the most important factors which result in further deterioration of the cascading failures in power systems. This paper introduces the breadth-first traversal principle firstly. The breadth-first traversal method is used to detect whether the island exist or not in the operating reliability assessment. Secondly, the transmission lines reliability model based on realtime operating conditions is built up. Finally, the reliability evaluation for IEEE 14-Bus test system under different operating states is conducted by using of the proposed algorithm. The calculation results illustrate that the indices can reflect the real time system state and provide operators with early warning information which points out the weakness of the power system.
机译:在电力系统中,当由于某些原因需要将传输线从网络上跳闸时,可能会导致其他一些传输线过载,尤其是与其相关的线路。传输线的过载被认为是导致电力系统级联故障进一步恶化的最重要因素之一。本文首先介绍了广度优先遍历原理。广度优先遍历方法用于检测运行可靠性评估中是否存在孤岛。其次,建立了基于实时工况的输电线路可靠性模型。最后,利用所提出的算法对IEEE 14-Bus测试系统在不同工作状态下的可靠性进行了评估。计算结果表明,该指标可以反映系统的实时状态,并为操作人员提供预警信息,指出电力系统的弱点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号