首页> 外文会议>2011 rapid excavation and tunneling conference >KRALOVOPOLSKY TUNNEL IN BRNO, CZECH REPUBLIC
【24h】

KRALOVOPOLSKY TUNNEL IN BRNO, CZECH REPUBLIC

机译:捷克共和国布尔诺的KRALOVOPOLSKY隧道

获取原文
获取原文并翻译 | 示例

摘要

The Kralovopolsky Tunnel is a road tunnel driven in neogenous clays, i.e., in difficultrnground, with low rock cover and a densely built-up area on the surface. The projectrninvolves two tunnel tubes 1.25 kilometres long, with adjacent subterranean technologicalrnspace. The excavation was carried out by sequential method with face divided intornsix partial excavations using heavy steel girders and shotcrete as initial support. Anrnarray of auxiliary measures such as compensation grouting, pipe roofs and jet groutingrnscreens was used, as well as extensive monitoring. The project has been going onrnsince 2006, opening is planned for 2012. The paper summarizes the tunnelling methodrnused and the gained experience.
机译:Kralovopolsky隧道是一种道路隧道,该隧道由新粘土驱动,即在高难度地面中,岩石覆盖率低,地表密集。该项目涉及两条1.25公里长的隧道管,以及相邻的地下技术空间。开挖采用顺序法进行,将工作面分为六部分,以重型钢梁和喷射混凝土作为初始支护。使用了一系列辅助措施,例如补偿灌浆,管棚和喷射灌浆筛网以及广泛的监控。该项目自2006年开始进行,计划于2012年开放。本文总结了所使用的隧道方法和获得的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号