首页> 外文会议>2011 rapid excavation and tunneling conference >ROCK FRACTURE SIMULATION FOR GROUNDWATER PREDICTION IN ROCK TUNNELS
【24h】

ROCK FRACTURE SIMULATION FOR GROUNDWATER PREDICTION IN ROCK TUNNELS

机译:岩石隧道地下水预测中的岩石破裂模拟

获取原文
获取原文并翻译 | 示例

摘要

Groundwater inflows in rock tunnels typically concentrate in narrow zones wherernconducting fractures cluster together: these concentrations may hamper tunnelrnadvance and are a major source of claims. However, current predictive methodologiesrndo not allow the designer or the contractor to predict these concentrations. Thernpaper describes a geostatistical methodology for the simulation of clusters and fracturesrnin 1D, 2D and 3D. The resulting discrete network of fractures could be used tornsimulate groundwater flow and predict groundwater inflow into tunnels. The simulationrnmethodology was demonstrated and validated by using data from Pedernales Falls,rnYucca Mountain nuclear waste disposal project (Barton and Larson 1985), and thernTBM-excavated South Cobb tunnel project (GA).
机译:岩石隧道中的地下水流入通常集中在狭窄的区域,在这些区域中,传导性裂缝聚集在一起:这些浓度可能会阻碍隧道的前进,并且是索赔的主要来源。但是,当前的预测方法不允许设计者或承包商预测这些浓度。该论文描述了一种用于模拟1D,2D和3D团簇和裂缝的地统计学方法。由此产生的离散裂缝网络可用于模拟地下水流并预测地下水流入隧道的情况。通过使用Pedernales Falls,Yucca Mountain核废料处置项目(Barton和Larson 1985)以及TBM开挖的South Cobb隧道项目(GA)的数据对模拟方法进行了论证和验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号