Piled raft over soft marine clay: Comparison of in-situ measurement and numerical analyses

机译:软质海洋粘土上的桩筏:原位测量与数值分析的比较

获取原文
获取原文并翻译 | 示例

摘要

Geotechnical works in deep deposit of highly compressible soft clay is always associated with excessive differential settlement. The site evaluation and settlement analysis had been performed on five cylindrical steel tanks situated at Pasir Gudang, Johor in which all of the tanks are currently in service for fuel oil storage. This paper will describes the methodology of geotechnical study and engineering analysis for constructing large scale steel tanks founded on piled raft over compressible soil layers. Discussion on the design method, engineering consideration and hydrostatic test of the cylindrical steel tanks were presented in subsequent sections. Hydrostatic test was conducted to verify the foundation adequacy of the steel tanks constructed on piled raft foundation and to minimize the post construction settlement of the tank to an acceptable limit. Hydrostatic test was carried out by gradually fill up the tank with water until full load, retain for few days and gradually empty the tank. The hydrostatic test data was used to assess the magnitude of displacement (settlement and heave) of the tanks. Forward analyses which predict the magnitude and pattern of settlement were also presented. The estimated and measured settlement had been compared, in which analysis by using all three methods gave good settlement prediction to the actual value. The controlling factors which contribute to various displacement profiles of the tanks, namely subsoil profile, pile termination condition and sea water tide were also discussed.
机译:高度可压缩的软粘土的深层沉积中的岩土工程总是与过度的差异沉降有关。对位于柔佛州Pasir Gudang的五个圆柱形钢制储油罐进行了现场评估和沉降分析,目前所有储油罐都在使用中。本文将介绍岩土工程研究方法和工程分析方法,以在可压缩土壤层上的桩筏上建造大型钢罐。在随后的部分中,将讨论圆筒形钢罐的设计方法,工程考虑因素和静水压试验。进行了静水压力测试,以验证在桩筏基础上建造的钢制储罐的地基充分性,并将储罐在建造后的沉降降至最低程度。通过逐渐向水箱中注满水直至满负荷进行静水压测试,保留几天并逐渐排空水箱。静水压力测试数据用于评估储罐的排水量(沉降和升沉)。还提出了预测沉降量和模式的前向分析。比较了估计和测量的沉降量,其中使用这三种方法进行的分析对实际值提供了良好的沉降预测。还讨论了影响储罐各种位移分布的控制因素,即底土分布,桩终止条件和海水潮汐。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号