首页> 外文会议>2011 46th International Universities' Power Engineering Conference >Feasibility Studies on Technical and Economic Impact of Combined Heat and Power (CHP) Generation on Energy Supply for Commercial Small Medium
【24h】

Feasibility Studies on Technical and Economic Impact of Combined Heat and Power (CHP) Generation on Energy Supply for Commercial Small Medium

机译:热电联产对中小型商业能源供应的技术和经济影响的可行性研究

获取原文
获取原文并翻译 | 示例

摘要

The purpose of this paper is to provide a technical and economic feasibility assessment on a SME to establish if it is suitable to install a CHP plant to provide onsite generation of electrical and thermal energy. The type of SME used for this paper as case study is a large shopping centre located at the south-west of the Republic of Ireland. At present, electrical energy is supplied from the Electricity Supply Board at 10.5kV while thermal energy for hot water is generated using onsite boiler using natural gas as prime fuel. The shopping centre has a total area of 55, 000 m(exp 2) where 23,225m(exp 2) is used as rentable retail space. Currently, the shopping centre provides facilities for over 70 commercial units. Electrical energy is distributed via 9 substation supplying different sections of the shopping centre. Each substations is equipped with energy metering facilities and based on annual records the average electrical load on the common areas (Lighting, HVAC, General Services) is 274kW with the peak demand of 345kW in any 15 min period. The average electrical load on the common areas during the day (8:00am-21:00pm) is 217kW, while during the night (21:00pm-8:00am) it is 57kW. From the data obtained from the Electrical Supply Board the average electrical load on the shopping centre is 1.78MW. Electrical energy consumption for each retail unit is individually metered and it is estimated that the main electrical load consists of lighting and HVAC. In the case of the supermarket the highest electrical energy demand is for supplying refrigerators that are required for perishable products. Refrigeration and HVAC can account for 60% of the electrical load on the supermarket.
机译:本文的目的是为中小型企业提供技术和经济可行性评估,以确定是否适合安装CHP厂来提供现场的电能和热能。作为案例研究,本文使用的SME类型是位于爱尔兰共和国西南部的大型购物中心。当前,从供电板以10.5kV提供电能,而热水的热能是使用以天然气为主要燃料的现场锅炉产生的。购物中心的总面积为55,000 m(exp 2),其中23,225m(exp 2)被用作可出租零售空间。目前,购物中心为70多个商业单位提供设施。电能通过为购物中心的不同区域供电的9个变电站进行分配。每个变电站均配备了电能计量设施,根据年度记录,公共区域(照明,暖通空调,一般服务)的平均电力负荷为274kW,在任何15分钟内的峰值需求为345kW。白天(8:00 am-21:00pm)在公共区域的平均电力负载为217kW,而夜间(21:00 pm-8:00am)则为57kW。根据从供电局获得的数据,购物中心的平均电力负荷为1.78MW。每个零售单位的电能消耗都是单独计量的,并且估计主要的电力负载包括照明和HVAC。在超级市场的​​情况下,最高的电能需求是供应易腐产品所需的冰箱。制冷和暖通空调可占超级市场的​​60%的电力负荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号