首页> 外文会议>2010 International conference on mine hazards prevention and control. >Subsidence, Bed Separation and Stress Change during Longwall Mining
【24h】

Subsidence, Bed Separation and Stress Change during Longwall Mining

机译:长壁开采过程中的沉陷,床层分离和应力变化

获取原文

摘要

A comprehensive field geotechnical monitoring program was carried out at West Cliff Colliery, Australia, which included one deep hole extensometer, two piezometers and two near-surface biaxial stressmeters installed at the bottom of a small valley above Longwall 32. A subsidence survey was carried out along two cross lines centered at the deep hole extensometer. The aim of this study was to determine the strata movement in the overburden rock mass in order to determine the injection horizons and evaluate injection efficiency for using the overburden grout injection technology to control subsidence. It was also aimed to monitor the nearsurface stress change to understand the mechanism of river bed fracturing and valley closure. This paper presents the new findings from this field monitoring study.
机译:在澳大利亚西崖煤矿进行了一项全面的岩土工程监测计划,包括在深壁长壁32上方小山谷底部安装一个深孔引伸计,两个压力计和两个近地表双轴应力计。进行了沉降调查。沿着以深孔引伸计为中心的两条交叉线。这项研究的目的是确定上覆岩体中的地层运动,以便确定注入层位并评估使用上覆岩浆注浆技术控制沉降的注入效率。它还旨在监视近地表应力变化,以了解河床压裂和山谷封闭的机理。本文介绍了该现场监测研究的新发现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号