Outage cost application in economic value evaluation of 115/22 kV substation construction for electronic industrial customers

机译:停电成本在电子工业客户115/22 kV变电站建设经济价值评估中的应用

获取原文
获取原文并翻译 | 示例

摘要

This paper, the fuzzy logic is proposed to evaluate the outage cost of large electronic industries in Thailand. Two selected parameters input in the fuzzy logic model are the peak demand and outage frequency. The simulation results of 105 large electronic industries with peak demand between 1 MW to 9 MW show that the outage cost is 35,067-938,267 Baht/event. Furthermore, the outage cost is used to assess the economic value of new 115/22 kV substation construction. In this article, the Air Insulated Substation (AIS) and Gas Insulated Substation (GIS) are used to demonstrate the economic value assessment of new substation in term of Return on Investment (ROI) and Internal Rate of Return (IRR). The results show that ROI and IRR of the AIS are better than ROI and IRR of the GIS both considering and without considering the outage cost.
机译:本文提出了一种模糊逻辑来评估泰国大型电子行业的停运成本。在模糊逻辑模型中输入的两个选定参数是峰值需求和中断频率。 105个峰值需求在1兆瓦至9兆瓦之间的大型电子行业的仿真结果表明,停运成本为35,067-938,267泰铢/事件。此外,停电成本用于评估新的115/22 kV变电站建设的经济价值。在本文中,空气绝缘变电站(AIS)和气体绝缘变电站(GIS)用于以投资回报率(ROI)和内部收益率(IRR)的方式演示新变电站的经济价值评估。结果表明,无论考虑还是不考虑停机成本,AIS的ROI和IRR均优于GIS的ROI和IRR。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号