首页> 外文会议>2010 International conference on construction and project management. >Contractors' Approaches to Risk Management at the Construction Phase in Malaysia
【24h】

Contractors' Approaches to Risk Management at the Construction Phase in Malaysia

机译:马来西亚施工阶段承包商的风险管理方法

获取原文
获取原文并翻译 | 示例

摘要

Often times, contractors failed to identify, plan, strategize, analyzed, execute, monitor, control and manage the risk involves during construction phase in Malaysia. Consequently, the contractor failed to complete the project on schedule, within client's budget and quality. The idea of introducing formal risk management among Malaysian contractors during construction phase is seem to be a proactive approach to achieve the project objectives. This paper intends to identify the application of formal risk management among the contractors during the construction phase in Malaysia. Questionnaires and interviews were used. It was found that although the risk management process in Malaysian construction industry has been introduced, most of them are not well structured and not being implemented in a formal manner. Therefore, it is suggested that these contractors should try to implement formal risk management and hope that the construction industry in Malaysia can enjoy the benefits and lead our industry effectively into the next stage of building the nation.
机译:通常,承包商在马来西亚的施工阶段未能识别,计划,制定战略,分析,执行,监控,控制和管理风险。因此,承包商未能在客户的预算和质量范围内按期完成项目。在施工阶段向马来西亚承包商引入正式风险管理的想法似乎是实现项目目标的一种积极方法。本文旨在确定正式风险管理在马来西亚施工阶段中承包商中的应用。使用问卷和访谈。人们发现,尽管已经引入了马来西亚建筑业的风险管理流程,但其中大多数结构并不完善,也没有以正式的方式实施。因此,建议这些承包商应尝试实施正式的风险管理,并希望马来西亚的建筑业能够从中受益并有效地将我们的行业带入建设国家的下一阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号