首页> 外文会议>2007 SPE Annual Technical Conference and Exhibition (ATCE 2007) >Improved Production and Process Optimization Through People, Technology, and Process
【24h】

Improved Production and Process Optimization Through People, Technology, and Process

机译:通过人员,技术和流程改善生产和流程优化

获取原文
获取原文并翻译 | 示例

摘要

A joint venture Production & Process Optimization project between Statoil and Schlumberger is targeting two distinct areas: Improved reservoir management to optimize the reservoir performance over the life of the field. Production optimization of the intelligent wells, production network and process facilities on a day-to-day basis. This is achieved through development of tools, methodologies and workflows. In order to support the change management process, a prototyping process has been developed for surveillance workflow development and deployment. The dynamic prototyping process allows a bottom-up development of workflows starting from data conditioning and reconciliation up to optimization and control. These different automation modes for provided workflows go along with deriving information and ultimately knowledge from production process data in order to improve decision making processes. A demonstration project will concentrate primarily on the Water Alternate Gas (WAG) cycle optimization process, which has been specified together with the asset team, and will describe how the workflow supports production optimization. The solutions are successively tested together with the Snorre B asset. Results from the demonstrator, change management issues and the concept of full integration of all decision making loops into a workflow framework will be presented in the paper. During the testing not only the application of the software solution was evaluated as well the impact on the organization and how changes in proposed work processes improved the inter domain collaboration within the team.The project has demonstrated successfully that three key areas have to be addressed simultaneous: Change Management procedures in order to introduce the developed workflows and software tools as early as possible Necessary software tools for providing a workflow oriented framework for production optimization Prototyping workflows and implementation through demonstration and pilot projects as well as permanent facilitators working with asset teams
机译:挪威国家石油公司(Statoil)与斯伦贝谢(Schlumberger)之间的合资生产与工艺优化项目的目标是两个不同的领域:改进油藏管理,以在整个油田寿命期内优化油藏性能。每天对智能井,生产网络和加工设施进行生产优化。这是通过开发工具,方法和工作流程来实现的。为了支持变更管理过程,已经开发了用于监视工作流开发和部署的原型过程。动态原型制作过程允许自下而上地开发工作流,从数据调节和协调到优化和控制。用于提供的工作流程的这些不同的自动化模式,以及从生产过程数据中获取信息和最终知识的过程,以改善决策过程。一个示范项目将主要集中在与资产团队一起指定的水替代气体(WAG)循环优化过程上,并将描述工作流程如何支持生产优化。这些解决方案与Snorre B资产一起进行了连续测试。本文将介绍演示者的结果,变更管理问题以及将所有决策循环完全集成到工作流框架中的概念。在测试过程中,不仅评估了软件解决方案的应用,还评估了对组织的影响以及拟议工作流程的变化如何改善团队内部的跨域协作。该项目成功地证明了必须同时解决三个关键领域:变更管理程序,以便尽早引入已开发的工作流和软件工具为生产优化提供面向工作流的框架所需的软件工具,通过演示和试点项目以及与资产团队合作的永久性促进者,对工作流进行原型设计和实施

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号