首页> 外文会议>2007 American Water Works Association annual conference and exposition (ACE 07) >One Utility’s Approach to Asset-based Management and Risk-based Approach to Prioritization
【24h】

One Utility’s Approach to Asset-based Management and Risk-based Approach to Prioritization

机译:一种公用事业公司基于资产的管理方法和基于风险的优先级方法

获取原文

摘要

Colorado Springs is the largest City in Colorado that is not located within proximity of a major source of supply. In fact, water supplies to Colorado Springs are as far away as 200 miles, stretching across seven counties before entering the terminal reservoirs above the City. The City relies on the transportation of large quantities of water to meet the need for uninterrupted water deliveries. rnMuch of the City’s raw water infrastructure investments occurred in the 1870’s, 1920’s 1930’s, 1950’s and 1960’s. Recent expansion projects were constructed in 2002. As the City plans for the next major delivery expansion, maintaining current service levels for the raw water infrastructure continues to be a major challenge. Historically, the raw water system has not been systematically evaluated to identify and prioritize renewal and replacement projects. A lack of both available asset information and historical operation and maintenance data was a regular occurrence.rn In 2004, Colorado Springs Utilities initiated the Raw Water Infrastructure Improvement Program with the stated goal of developing a baseline condition assessment of all raw water delivery systems exclusively owned and operated by the Utility. Additionally, this project would set the framework for several service lines that are incorporating a utility wide Asset Management Program. To date, Colorado Springs Utilities has completed the third of a four phase project that incorporates Condition Assessment, Asset Mapping and Inventory, Risk Based Prioritization for Capital and Operation and Maintenance funding, and the development of processes and procedures to implement an Asset Based Management Program. rnWith the Program as the backdrop, this paper will present the challenges, solutions implemented, processes and procedures developed to ensure continued progress toward a utility wide Asset Management Program, and lessons learned to provide insights for other utility owners that are tasked to do more with less.
机译:科罗拉多斯普林斯是科罗拉多州最大的城市,位于主要供应来源附近。实际上,到科罗拉多斯普林斯的供水距离最远为200英里,横跨七个县,然后才进入城市上方的终端水库。纽约市依靠大量水的运输来满足不间断供水的需求。 rn纽约市的原水基础设施投资大部分发生在1870、1920、1930、1950和1960年代。最近的扩展项目建于2002年。随着纽约市计划进行下一个主要交付扩展,保持原水基础设施的当前服务水平仍然是一项重大挑战。从历史上看,未对原水系统进行系统评估以识别更新和替换项目并确定其优先级。经常会缺少可用的资产信息以及历史运营和维护数据。rn2004年,科罗拉多斯普林斯公用事业公司启动了“原水基础设施改善计划”,其既定目标是对所有专有原水输送系统进行基准状态评估并由实用程序进行操作。此外,该项目将为合并了公用事业范围的资产管理计划的多个服务线设置框架。迄今为止,科罗拉多斯普林斯公用事业公司已经完成了一个四阶段项目中的第三阶段,该项目包括条件评估,资产映射和库存,基于风险的资本优先级分配以及运营和维护资金,以及开发过程和程序以实施基于资产的管理计划。 rn以该计划为背景,本文将介绍为确保公用事业范围的资产管理计划的持续进展而开发的挑战,解决方案,所开发的过程和程序,以及从中汲取的经验教训,以为其他承担更多责任的公用事业所有者提供见解。减。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号