首页> 外文会议>2005 World energy engineering congress (WEEC 2005) >WEEC 2005 - World Energy Engineering Congress10 Strategic Steps to Reducing Your Energy Costs
【24h】

WEEC 2005 - World Energy Engineering Congress10 Strategic Steps to Reducing Your Energy Costs

机译:WEEC 2005-世界能源工程大会降低能源成本的10项战略步骤

获取原文
获取原文并翻译 | 示例

摘要

If your company is looking at energy management as part of its overall strategy to reduce costs andrnimprove profits, it is not alone. While energy prices have increased at a shocking rate, so has interest inrnenvironmental responsibility. Progressive organizations are exploring ways to conserve energy and reducerngreenhouse gases. Some are even creating new positions for these issues, placing someone in charge ofrncorporate social responsibility (CSR). The CSR's job is to help a company be more socially responsible andrnreduce harmful emissions. Energy management can accomplish both conservation and emission goals—rnplus, it lowers utility costs and strengthens your bottom line!rnIn the past, reasonably priced energy made it difficult to justify new conservation projects. It was hard tornmeet the standard criteria of 2-3 years payback. However, natural gas prices have tripled in the last fivernyears from $2 to over $6 per Dekatherm (Dth). Electric prices also have increased dramatically—by morernthan 100% in some parts of the country. These increased energy costs have made conservation projectsrnmore desirable. A natural gas improvement project that had a six-year payback five years ago may havernless than a two-year payback today.rnNew technologies also have helped drive down the payback of projects and opened up new areas forrnpotential savings. The following paper looks at how the new market offers opportunities to reduce overallrnenergy costs.
机译:如果您的公司将能源管理作为降低成本,提高利润的整体战略的一部分,那么它并不孤单。尽管能源价格以惊人的速度增长,但对环境责任的关注也是如此。进步的组织正在探索节约能源和减少温室气体的方法。有些甚至为这些问题建立新的职位,将某人安排为企业社会责任(CSR)负责人。 CSR的工作是帮助公司提高社会责任感并减少有害排放。能源管理既可以实现节能目标,也可以实现排放目标,而且可以降低公用事业成本并提高您的利润!在过去,合理定价的能源使新的节能项目难以合理化。很难满足2-3年回收期的标准标准。然而,在过去五年中,天然气价格从每Dekatherm(Dth)的2美元增加到6美元以上,增长了两倍。电价也急剧上涨,在该国某些地区,涨幅超过100%。这些增加的能源成本使保护项目更加可取。一个五年前有六年回收期的天然气改进项目,今天可能还不到两年。新技术还帮助降低了项目的回收率,并开辟了潜在节余的新领域。以下文章着眼于新市场如何为降低总体能源成本提供机会。

著录项

  • 来源
  • 会议地点 Austin TX(US);Austin TX(US)
  • 作者

    Gary A. Swanson;

  • 作者单位

    Energy Management SolutionsrnChanhassen, MN (612) 819-7975 (Phone) gswanson@EMSenergy.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-26 14:23:48

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号