首页> 外文会议>2004 Envisat amp; ERS symposium >RADIOMETRIC PATH DELAY CALIBRATION OF ERS-2WITH APPLICATION TO ALTIMETRIC RANGE
【24h】

RADIOMETRIC PATH DELAY CALIBRATION OF ERS-2WITH APPLICATION TO ALTIMETRIC RANGE

机译:ERS-2的辐射路径延迟校准在高程范围中的应用

获取原文
获取原文并翻译 | 示例

摘要

The accuracy and stability of the atmospheric wet pathrndelay as measured by the microwave radiometer onboardrnERS-2 is crucial to altimetric measures of sea-levelrnchange. In this study a GPS receiver on an oil platformrnin the North Sea is first used to quantify the ERS-2 radiometic wet path delay for the period 1999-2003. Thernobserved discrepancies between the GPS results and thernradiometer motivate an extended study utilising a networkrnof 13 IGS stations operational for 1995 through tornthe present day. The GPS wet path delays are convertedrnto an equivalent brightness temperature on the 23.8GHzrnchannel and used in a subsequent analysis to determinerna correction formula. The new formulism is validated byrnutilising coldest and mean tempertures for each ERS-2rncycle 1-85.
机译:由ERS-2板上的微波辐射计测量的大气湿路径延迟的准确性和稳定性对于海平面变化的高度测量至关重要。在这项研究中,首先使用北海石油平台上的GPS接收器来量化1999-2003年期间ERS-2辐射湿路径的延迟。 GPS结果与辐射计之间的热能差异,促使人们利用网络的13个IGS台站进行了扩展研究,该台IGS站一直运行到1995年,直到今天。 GPS湿路径延迟被转换为23.8GHz信道上的等效亮度温度,并在随后的分析中用于确定误差校正公式。通过使用每个ERS-2rncycle 1-85的最冷和平均温度来验证新的公式。

著录项

  • 来源
  • 会议地点 Salzburg(AT)
  • 作者单位

    School of Civil Engineering and Geosciences, Newcastle University, Newcastle, NE1 7RU, UK;

    School of Civil Engineering and Geosciences, Newcastle University, Newcastle, NE1 7RU, UK;

    School of Civil Engineering and Geosciences, Newcastle University, Newcastle, NE1 7RU, UK;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    radiometer; GPS; wet path delay; temperaturernbrightness;

    机译:辐射计全球定位系统;湿路延迟;温度亮度;
  • 入库时间 2022-08-26 13:47:53

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号