首页> 外文会议>2002 International Joint Power Generation Conference, Jun 24-26, 2002, Scottsdale, Arizona >CASE STUDY: SOLVING VIBRATION PROBLEMS IN HIGH SPEED BOILER FEEDWATER PUMPS USING EXPERIMENTAL AND ANALYTICAL TECHNIQUES
【24h】

CASE STUDY: SOLVING VIBRATION PROBLEMS IN HIGH SPEED BOILER FEEDWATER PUMPS USING EXPERIMENTAL AND ANALYTICAL TECHNIQUES

机译:案例研究:使用实验和分析技术解决高速锅炉给水泵中的振动问题

获取原文
获取原文并翻译 | 示例

摘要

Entergy's Willow Glen Unit 4 main boiler feed pumps experienced high vibration levels and short run times since installation in the 1970's. The two 14,000 horsepower units have been rebuilt many times, with operating life averaging 18 months before vibration levels became excessive. To operate the unit until the next outage, operators had to reduce the running speed of the turbine drivers to control pump vibration and generate less electricity. Vibration and modal analysis testing coupled with lateral rotor dynamic computer models indicated that changing the stiffness of the bearing housing supports and rotor could significantly improve the pump. It was decided to proceed with design changes and as an interim solution fit the pumps with dynamic absorbers to reduce bearing housing vibrations. After the design changes were incorporated the pump operates with vibration levels in the.15 ip/s range.
机译:自1970年代安装以来,Entergy的Willow Glen Unit 4主锅炉给水泵就经历了高振动水平且运行时间短。这两个14,000马力的设备已经进行了多次改造,平均使用寿命长达18个月,直到振动水平变得过高为止。为了在下一次停电之前运行该设备,操作员必须降低涡轮驱动器的运行速度,以控制泵的振动并产生较少的电能。振动和模态分析测试以及横向转子动态计算机模型表明,改变轴承座支架和转子的刚度可以显着改善泵。决定继续进行设计更改,作为临时解决方案,为泵配备动态减震器以减少轴承座的振动。合并设计更改后,泵将以15 ip / s的振动水平运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号