首页> 外文会议>2002 ASME International Mechanical Engineering Congress and Exposition , Nov 17-22, 2002, New Orleans, Louisiana >THE TOP DOWN RISK MANAGEMENT SYSTEM OF THE OFFSHORE OPERATIONS OF THE EKOFISK PROTECTIVE BARRIER
【24h】

THE TOP DOWN RISK MANAGEMENT SYSTEM OF THE OFFSHORE OPERATIONS OF THE EKOFISK PROTECTIVE BARRIER

机译:EKOFISK保护壁垒海上作业的自上而下的风险管理系统

获取原文
获取原文并翻译 | 示例

摘要

The Ekofisk Field in the centre of the North Sea is a very important junction in the oil producing and transporting North Sea network. In 1987, the wave loads on the Ekofisk Installations had become unacceptable, due to a significant seabed subsidence. In order to cope with the increased wave loads, it was decided to build a Protective Barrier around the central Ekofisk Storage Tank. This barrier was to be installed in two separate half units, which were to be brought to the Ekofisk Field in floating condition. After installation, the two halves were to be structurally connected. The paper deals with the overall risk management of the total offshore operations, including tow-out, installation, coupling and completion. The operations were governed by conflicting requirements with respect to relevant aspects like stability, strength, stiffness, weight, geometry and were perceived to be extremely risky due to the marginal resistance against the expected load cases. The operations were weather dependent, thus dominated by changing stochastic boundary conditions. Most of the processes were irreversible, non-linear, and determined by a large number of variables. A top down risk management system was developed for control purposes. The system provided a continuous insight right from the very start of the project till the end of the project in the percentage of failure in the most relevant failure modes as a function of tow out date. The system allowed for strategic, tactical and operational interventions in case critical criteria were exceeded. This in particular makes that the approach - even 10 years after completion of the project - is still a new development in risk management and an interesting basis of further research on control of the design, construction and installation of complex Civil Engineering and other Systems.
机译:北海中心的Ekofisk油田是北海石油生产和运输网络中非常重要的交汇处。 1987年,由于海床沉陷严重,Ekofisk装置上的波浪载荷变得不可接受。为了应对不断增加的波浪载荷,决定在中央Ekofisk储罐周围建立一个防护屏障。该屏障将安装在两个单独的半单元中,并以漂浮状态将其带到Ekofisk场。安装后,将两半结构连接。本文涉及整个海上作业的总体风险管理,包括拖船,安装,连接和完工。这些操作受到有关稳定性,强度,刚度,重量,几何形状等相关方面的相互矛盾的要求的约束,并且由于对预期负载情况的边际阻力而被认为具有极大的风险。作业取决于天气,因此以随机边界条件的变化为主导。大多数过程都是不可逆的,非线性的,并且由大量变量决定。为了控制目的,开发了自上而下的风险管理系统。从项目开始到项目结束,系统就提供了最相关的故障模式下故障百分比作为拖出日期的函数的持续洞察力。该系统允许在超出关键标准的情况下进行战略,战术和操作干预。这尤其使该方法(即使在项目完成后的10年之内)仍然是风险管理方面的新发展,并且是进一步研究复杂土木工程及其他系统的设计,施工和安装控制的有趣基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号