IMPROVING SETTLED WATER QUALITY TO MEET IESWTR

机译:满足IESWTR改善水质

获取原文
获取原文并翻译 | 示例

摘要

The largest surface water treatment plant for the City of Austin, Texas is the A.R. Davis Water Treatment Plant (WTP). The Davis WTP was originally constructed in 1954 and was subsequently expanded in 1961 and 1974 to its present capacity of 120 MGD. Due to the hardness of the raw water, partial lime softening is the treatment process for the plant, which includes a raw water intake, three rapid mix basins, nine separate flocculation and sedimentation trains followed by filtration. Historically, it has been difficult to consistently achieve settled water turbidity from the basins under 2 NTU. With the passage of the Interim Enhanced Surface Water Treatment Rule, the filtered water quality requirements will be reduced from 0.5 NTU to 0.3 NTU. While the plant can typically achieve that requirement, it was felt that improvements were needed to insure that the filtered water turbidity would exceed the requirement all the time. With that, improvements were needed to the settled water quality to meet a goal of less than 2 NTU to insure compliance with the new filtered water turbidity requirements. As part of an overall rehabilitation project to replace the old flocculator equipment, the City took the opportunity to determine the improvements needed in the basins to reduce the settled water turbidity.
机译:A.R.是德克萨斯州奥斯汀市最大的地表水处理厂。戴维斯水处理厂(WTP)。戴维斯污水处理厂最初建于1954年,随后在1961年和1974年进行了扩建,使其目前的容量为120 MGD。由于原水的硬度,石灰的部分软化处理是工厂的处理过程,其中包括原水取水口,三个快速混合池,九个独立的絮凝和沉淀塔,然后进行过滤。从历史上看,要始终如一地从2 NTU以下的盆地中获得稳定的水浊度是困难的。随着《临时强化地表水处理规则》的通过,过滤水的质量要求将从0.5 NTU降低到0.3 NTU。虽然工厂通常可以达到该要求,但人们认为需要进行改进以确保过滤后的水浊度始终超过要求。因此,需要对沉降水质量进行改进,以达到小于2 NTU的目标,以确保符合新的过滤水浊度要求。作为更换旧絮凝器设备的整体修复项目的一部分,纽约市借此机会确定了流域所需的改进措施,以减少沉降的水浊度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号