首页> 外文会议>1st World Conference on Explosives amp; Blasting Technique, 1st, Sep 6-8, 2000, Munich/Germany >Results that may increase efficiency in salt mines when the integrity of the underground mining structures is provided
【24h】

Results that may increase efficiency in salt mines when the integrity of the underground mining structures is provided

机译:当提供地下采矿结构的完整性时,可能会提高盐矿效率的结果

获取原文
获取原文并翻译 | 示例

摘要

The paper presents the results obtained in the assessment of seismic action of blasting performed in four Romanian salt mines where small room ad square pillar method is applied. Function of the time taken to mine a level, of the size of the rooms in course of excavation, of the medium radius of the area with elastic deformations, and the results of the seismic measurements, the explosive charges possible to be blasted were established for each separate seam, providing in the same time seismic protection for the floors and inter-room pillars. Current blasting methods applied in two of the salt mines considered - Ocna Dej and Praid - had to be revised, in order to meet the established seismic restrictions. The results obtained were appreciated by the salt mines, since they contributed to the increase in efficiency of the blasting operations and to minimise the risks.
机译:本文介绍了在评估罗马尼亚的四个使用小型房间方柱法的盐矿中进行爆破地震作用时获得的结果。开采水平所需的时间,开挖过程中的房间大小,具有弹性变形的区域的中等半径以及地震测量结果的函数,确定了可能爆炸的装药量每个单独的接缝,同时为地板和房间间的支柱提供地震保护。为了满足既定的地震限制,必须修改目前考虑的两个盐矿中的爆破方法-Ocna Dej和Praid-。盐矿对获得的结果表示赞赏,因为它们有助于提高爆破作业的效率并使风险最小化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号