首页> 外文会议>19th annual North American waste to energy conference >THE TECHNICAL AND ECONOMIC CONSIDERATIONS FOR EXTRACTING METALS FROM ASH AT WASTE-TO-ENERGY (WTE) FACILITIES - GO OR NO GO!
【24h】

THE TECHNICAL AND ECONOMIC CONSIDERATIONS FOR EXTRACTING METALS FROM ASH AT WASTE-TO-ENERGY (WTE) FACILITIES - GO OR NO GO!

机译:从废物转化为能源(WTE)设施中从灰中提取金属的技术和经济考虑-行动不便!

获取原文
获取原文并翻译 | 示例

摘要

The past few years have produced significant variations in the U.S. economic climate. In turn, the revenues from the extraction and sale of both ferrous and non-ferrous metals from WTE plants have experienced wildly positiveegative swings in value. The revenue from sales of these metals and the capital costs for the process installation directly impacts financial payback, and answers the simple question: "should we do this project?" Some key criteria will be discussed: source reduction and curbside recycling and their impact on metals yield (projected vs. actual), plant size and "economy of scale", and operating and maintenance costs. This paper will review six recent and planned metals recovery projects in the U.S. Technologies and scopes of work include simple addition of metals recovery equipment, complete systems and buildings at existing facilities, and planned systems and buildings at new facilities. The paper will summarize the criteria for metals revenue and project costs, which determine whether the project is a "Go" or a "No Go".
机译:过去几年,美国的经济环境发生了重大变化。反过来,来自WTE工厂的黑色金属和有色金属的提取和销售收入却出现了正/负的价格波动。这些金属的销售收入和过程安装的资本成本直接影响财务回报,并回答一个简单的问题:“我们应该做这个项目吗?”将讨论一些关键标准:减少源头和路边回收及其对金属产量的影响(预计与实际),工厂规模和“规模经济”以及运营和维护成本。本文将审查美国六个近期和计划中的金属回收项目。技术和工作范围包括简单地添加金属回收设备,现有设施的完整系统和建筑物以及新设施的计划的系统和建筑物。本文将总结金属收入和项目成本的标准,这些标准确定项目是“执行”还是“不执行”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号