In a recent National survey, Seattle topped the list for having the worst daily traffic congestion. To address this problem, Sound Transit is planning to build 40 km (24 miles) of light rail, including ten kilometers (six miles) of twin tunnels with four subway stations 40 m (130 ft.) to 65 m (210 ft.) deep. The overall schedule is very aggressive and Sound Transit is preparing four separate heavy civil construction contracts for simultaneous underground construction. Three of these contracts are being considered for design-build. Final design will start in March 2000 and all underground construction must be completed by the end of 2005.