首页> 外文会议>International conference on nuclear engineering;ICONE5 >MAJOR TECHNICAL EVENTS OCCURRED AT DAYA BAY NPP AND LONG TERM ENGINEERING ISSUES
【24h】

MAJOR TECHNICAL EVENTS OCCURRED AT DAYA BAY NPP AND LONG TERM ENGINEERING ISSUES

机译:大亚湾核电站发生的主要技术事件和长期工程问题

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Having three years commercial operation experience, DayarnBay nuclear power plant (NPP) is considering its long termrnengineering issues thanks to the experiences gained fromrnresolution of several major technical events during past 3rnyears.rnThis article aims:rn· To present the major technical events occurred at Daya Bay,rnsuch as Generator H2 leakage, condenser tubes leakage,rncontrol rod dropping time deviation, main excite rotorrndamage;rn· To introduce the long term engineering issues that DayarnBay will face and the strategy Daya Bay adopts to dealrnwith;rn· To share with the other utilities Daya Bay’s experiencesrnand concerns.
机译:DayarnBay核电厂(NPP)具有三年的商业运营经验,这要归功于过去3年中从数项重大技术事件的解决中获得的经验。长期目标是考虑在Daya发生的重大技术事件。海湾,例如发电机H2泄漏,冷凝器管泄漏,控制杆掉落时间偏差,主激励转子损坏等; rn介绍DayarnBay将面临的长期工程问题以及大亚湾采取的应对策略; rn其他公用事业大亚湾的经历和关注。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号