首页> 外文会议>1992 IEEE cement industry technical conference : Record of conference papers >NGC requirements for commissioning-management and practice
【24h】

NGC requirements for commissioning-management and practice

机译:NGC的调试管理和实践要求

获取原文
获取原文并翻译 | 示例

摘要

In the mid 1990s, and in recognition of the fact that thenintegrity of the power system is dependent upon equipment enteringnservice which has been commissioned to a high technical standard, the UKnNational Grid Company (NGC) embarked upon the major task of redefiningnits whole approach to commissioning. To this end, the company has bothnreformulated the management process for commissioning, and established anmethod of training and authorisation for all staff who have formalncommissioning responsibilities. These initiatives will eventually benshared with NGC's suppliers. This paper briefly describes some of thenmajor aspects of the initiatives undertaken
机译:在1990年代中期,由于认识到电力系统的完整性取决于设备的服役和已投入高技术水平的设备的使用,英国国家电网公司(NGC)承担了重新定义整个调试方法的主要任务。 。为此,该公司不仅重新制定了调试管理流程,而且为所有负有正式调试职责的员工建立了培训和授权方法。这些举措最终将与NGC的供应商共享。本文简要介绍了所采取措施的主要方面

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号