Bulk Settlement of the New Elevated Station at South Pole

机译:南极新高架车站的大批安置

获取原文
获取原文并翻译 | 示例

摘要

The US Antarctic Program is nearing completion of a 9-year project to reconstruct its primary facility at the geographic South Pole. The new building is elevated and jackable to accommodate its presence in a snow accumulation zone, The building's foundation consists of rigidly connected grade beams to which 36 columns extend upward 13-ft (4-m) to support the new state-of-the-art living and scientific facility.rnDesign of the Elevated Station recognized that bulk and differential settlement of the facility would occur into the 9,295-ft (2,833-m) deep substrate (glacial ice overlain by firn with dense windblown snow int the uppermost 100 ft (30 m)). Routine facility maintenance is required to level and shim columns when it is apparent that differential settlement limits are near. (Differential settlement analysis is discussed in a separate paper.)rnIn addressing bulk settlement, designers of the Elevated Station anticipated the need for major jacking at each column and insertion of 12-ft (3.7-m) extensions. It was calculated that this would be required approximately every 15 years. Two column extensions were envisioned, giving the facility a potential life span of about 45 years.rnThis paper analyzes the settlement data for the Elevated Station from the placement of the first columns (November 2000) until January 2005. We show that column settlement slows from a rate of over 4 inches (10 cm) per year during the first year of existence to near 2 in (5 cm) per year during their fourth year in place. Settlement data so far match the pattern shown in the literature for laboratory tests of static loads on snow.
机译:美国南极计划即将完成为期9年的项目,以重建其在地理南极的主要设施。新建筑物是高架的,可以顶起以容纳在积雪区域中。建筑物的基础包括刚性连接的坡度梁,36根柱子向上延伸至13英尺(4-m),以支撑新的状态。高架车站的设计意识到,该设施的体积和差异沉降将发生在9,295英尺(2,833-m)的深层基底中(冰川冰层覆盖着一层厚厚的风吹雪,而最高的100英尺处则是( 30 m))。当明显的差异沉降极限已接近时,需要对设施进行例行的日常维护,以对色谱柱进行水平和匀场。 (在不同的论文中讨论了差异沉降分析。)在处理大体积沉降时,高架车站的设计人员预计需要在每根立柱上进行大型顶升并插入12英尺(3.7米)的延长段。据计算,大约每15年需要一次。设想了两列的扩展,使该设施的潜在寿命约为45年。rn本文分析了从第一列的放置(2000年11月)到2005年1月高架车站的沉降数据。在存在的第一年中,每年超过4英寸(10厘米)的速率,在就位的第四年中,每年接近2英寸(5厘米)的速率。到目前为止,沉降数据与文献中所示的用于雪上静态载荷的实验室测试的模式相匹配。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号