首页> 外文会议>17th Anniversary of the International Simulatros Conference, Apr 16-20, 2000, Washington, D.C. >SIMULATION OF MATERIALS INVENTORY IN A MANUFACTURING PLANT WITH WORLD-WIDE SUPPLIERS AND CUSTOMERS
【24h】

SIMULATION OF MATERIALS INVENTORY IN A MANUFACTURING PLANT WITH WORLD-WIDE SUPPLIERS AND CUSTOMERS

机译:具有全球供应商和客户的制造工厂中的物料库存模拟

获取原文
获取原文并翻译 | 示例

摘要

The goal of this project was to develop an inventory computer model to better understand the effect of demand variation and lead times on inventory turnover in a manufacturing plant. In this particular situation, the manufacturing plant was located in Asia, with suppliers in Japan, and the United States while the customer was in Australia. The computer model was developed using the AweSim simulation software, with input in the form of customer forecasts from Excel. The output from the model shows the level of RM, WIP, and FG inventory in terms of the number of units, the value of the units, and the days of inventory on hand over a 52 week period, both as static and dynamic output. The user is free to change the forecasts, lead times, or costs to see the effect on inventory.
机译:该项目的目的是开发一个库存计算机模型,以更好地了解需求变化和交货时间对制造工厂中库存周转的影响。在这种特殊情况下,制造厂位于亚洲,而供应商在日本和美国,而客户在澳大利亚。该计算机模型是使用AweSim仿真软件开发的,并以Excel的客户预测形式输入。该模型的输出以单位数量,单位价值以及52周内手头上的库存天数显示了RM,WIP和FG库存的水平,包括静态和动态输出。用户可以自由更改预测,交货时间或成本,以查看对库存的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号