LIFE CYCLE MANAGEMENT (LCM) PLANNING FOR MAIN CONDENSERSAND ISOLATION VALVES

机译:主要冷凝器和隔离阀的寿命周期管理(LCM)规划

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Life Cycle Management (LCM) planning is intended to provide an effective long-term planning tool with which tornminimize unplanned capability loss and optimize maintenance programs and capital investment consistent with plant safetyrnand an identified plant operating strategy. Such an operating strategy might include license renewal or retaining the option forrnlicense renewal. An LCM Plan addresses such issues as aging management, preventive maintenance, technical obsolescence,rnand the replacement or redesign of a system, structure, or component (SSC) important to safety and plant operation. In short,rnLCM Planning is viewed as a viable process with which to systematically identify and examine important SSCs; optimizerntheir contribution to plant safety, reliability, availability and value; and prepare long-term maintenance management plans forrnthem.rnIn 1998, EPRI initiated the development of a new LCM planning process in cooperation with two utilities, NorthernrnStates Power Company and Duke Power Company. The first phase of the EPRI project established a methodology tornsystematically evaluate SSCs for the purposes of LCM planning, generated an SSC selection process, and developedrnsoftware tools for LCM planning. It also successfully validated the software tools by demonstrating the process for threernselected systems at each of two plants.rnThe second phase of this EPRI LCM planning demonstration program has the objective of applying the LCMrnplanning process and tools developed in the first phase of the project to three selected SSCs at each of two additional plants,rnthe VC Summer Station and the Wolf Creek Nuclear Power Plant.rnThis paper provides a brief discussion of the applied process and results in terms of evaluated alternative plans andrnoptimum LCM plan for one example SSC for each of the two plants.
机译:生命周期管理(LCM)计划旨在提供有效的长期计划工具,以最小化计划外的能力损失,并根据工厂安全和已确定的工厂运营策略优化维护计划和资本投资。这样的操作策略可能包括续签许可证或保留可选的续签许可证。 LCM计划解决诸如老化管理,预防性维护,技术过时,对安全和工厂运营至关重要的系统,结构或组件(SSC)的更换或重新设计之类的问题。简而言之,LCM规划被视为一个可行的过程,可用于系统地识别和检查重要的SSC;优化其对工厂安全性,可靠性,可用性和价值的贡献;并为该计划准备长期维护管理计划。1998年,EPRI与NorthernrnStates电力公司和Duke电力公司这两个公用事业公司合作,开始了新的LCM规划过程的开发。 EPRI项目的第一阶段建立了一种用于LCM规划的系统评估SSC的方法,生成了SSC选择过程,并开发了用于LCM规划的软件工具。它还通过演示两个工厂中三个选定系统的过程来成功地验证了软件工具。此EPRI LCM规划演示程序的第二阶段的目标是将项目第一阶段中开发的LCM计划过程和工具应用于三个在VC Summer Station和Wolf Creek核电厂这两个另外的工厂中分别选择了SSC。两棵植物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号