Derivation of Seismic Risk Estimates from Seismic Margin Assessments

机译:从地震余量评估推导地震风险估计

获取原文
获取原文并翻译 | 示例

摘要

The objective of this study has been to ascertain whether certain risk-type safety insights can be extracted from arnSeismic Margin Assessment (SMA) performed for a nuclear power plant, and to identify any limitations to the applicability ofrnsuch insights. The approach has been to use as case studies the seismic analyses done by two nuclear power plants (SurryrnUnit 1 and Nine Mile Point Unit 2). NMP-2 possesses both an SMA and a Seismic Probabilistic Risk Assessment (SPRA),rnwhereas Surry possesses only an SPRA. The notion tested was whether, given only an SMA, it is feasible to developrnelements of a pseudo-SPRA and obtain results and safety insights typical of a full SPRA, such as seismic-initiated coredamagernfrequency. The conclusion of the project is that this is feasible if certain prescribed procedures are followed, but thernsafety insights are not as robust as could be obtained from a full SPRA. The implications of this finding for the new standardrnfor SPRA methodology being developed by the American Nuclear Society are also explored, and requirements that might bernincorporated into that standard are proposed.
机译:这项研究的目的是确定是否可以从对核电厂进行的抗震裕度评估(SMA)中提取某些风险类型的安全见解,并确定对此类见解的适用性是否有任何限制。该方法已被用作案例研究,由两个核电厂(Surryrn装置1和Nine Mile Point装置2)进行了地震分析。 NMP-2同时拥有SMA和地震概率风险评估(SPRA),而Surry仅拥有SPRA。测试的概念是,仅给定SMA,是否可以开发伪SPRA的元素并获得完整SPRA典型的结果和安全见解,例如地震引发的磁心大地频率。该项目的结论是,如果遵循某些规定的程序,这是可行的,但是安全洞察力不如完整SPRA所能提供的可靠。还探讨了这一发现对美国核协会正在开发的SPRA方法新标准的含义,并提出了可能纳入该标准的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号