Railway Tunnels Excavated by TBM and Deep Bore Blasting Method in Japan

机译:日本TBM和深孔爆破开挖的铁路隧道。

获取原文
获取原文并翻译 | 示例

摘要

The Ministry of Construction is currently proceeding with the Yamba Dam project in Agatsuma-gun, Gunma Prefecture, located about 100km north of Tokyo. The project will result in the partial inundation of the Agatsuma Line (single track, JR Eastern Japan) and will necessitate the replacement of about 10km of track. Three tunnels are planned for about 8km of this relocated track, specifically from the starting point, the Yamba tunnel, the Kawarayu tunnel and the Yokokabe tunnel. The decision was made for various reasons, such as the natural ground conditions, environment of the surroundings and economical viability, to carry out the construction work of the Yamba and Kawarayu tunnels.
机译:建设部目前正在进行位于东京以北约100公里的群马县吾妻郡的Yamba大坝项目。该项目将导致Agatsuma Line(JR东日本的单线)部分淹没,并将需要更换约10 km的线。计划在此重新布置的轨道的大约8公里处修建三个隧道,特别是从起点开始的Yamba隧道,Kawarayu隧道和Yokokabe隧道。出于各种原因(包括自然地面条件,周围环境和经济可行性)做出了决定,决定进行Yamba和Kawarayu隧道的建设工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号