A new railway line("JOBAN NEW line") connecting Akihabara station in Tokyo and Tsukuba station in the Ibaraki prefecture has been planned. Kitasenju station, located in the northeast of Tokyo, is a station crowded with about 400,000 passengers per day, as four railway lines ride into it. A new 400 meter elevated bridge station for JOBAN NEW line is being planned to be constructed just above the existing platforms which experience more than 400 train stops per day. Considering that many passengers use this platform, the new station's columns on the platform have to be built in a short period of time and be shaped slender. Therefore, the CFT structure has been chosen for the new station's columns because of its high strength and ductility, as well as the socket type joint between CFT columns and RC piles due to its simplicity and low costs. The socket type joint is a simple sleeve joint in which a CFT column is inserted by the specific length to a RC pile whose top is covered with a steel pipe ("socket pipe"). A socket pipe is cheaper and easier to be built than conventional joints with anchor frames or melting. This type of joint has already proposed. And there are some structures which are built with socket type joints.''However, any destruction behavior of joint, for example, flow of bending moment and shear force, has not been made clear so far. So some model tests about joints of CFT structure have been carried out. And the destruction behavior was clearly described, and a calculation method about ultimate strength of joint was proposed. This paper describes a design method of socket joints that is proposed, as well as design and construction details about socket joints of the new elevated bridge at Kitasenju station.
机译:计划将连接东京的秋叶原站和茨城县的筑波站的一条新铁路线(“ JOBAN新线”)。位于东京东北部的北千住车站,每天有约40万人次的旅客拥挤,其中有四条铁路线。正在计划为JOBAN NEW线建造一个新的400米高架桥站,该桥站正好位于现有平台上方,每天有400多个火车停靠站。考虑到许多乘客使用该平台,因此平台上新车站的立柱必须在很短的时间内建成并且形状要细长。因此,CFT结构因其高强度和延展性而被选作新站的立柱,并且由于其简单性和低成本而选择了CFT立柱与RC桩之间的承插式接头。承插式接头是一种简单的套筒接头,其中将CFT柱按特定长度插入到RC桩中,该桩的顶部覆盖有钢管(“套管”)。与具有锚定框架或熔化的传统接头相比,承插管更便宜且更易于制造。这种接头已经提出。还有一些用承窝式接头建造的结构'',但是到目前为止,接头的任何破坏行为,例如弯矩和剪切力的流动,还不清楚。因此,对CFT结构的节点进行了一些模型试验。并清楚地描述了破坏行为,并提出了一种关于节点极限强度的计算方法。本文介绍了所提出的承插接缝设计方法,以及北千住站新高架桥的承插接缝的设计和施工细节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号